

TANJUNG AGAS HYDROGEN FACILITIES (TAH2F), PEKAN, PAHANG
Utility-scale hydrogen manufacturing
DAZ Solutions is advancing infrastructure-grade electrolysis development within the Tanjung Agas industrial corridor, positioning the project as a strategic anchor for large-scale green hydrogen manufacturing in Malaysia’s East Coast Economic Region. By integrating engineered electrolysis systems, industrial utilities, port-linked logistics and long-term offtake planning, the development is designed to support reliable hydrogen production for both domestic industrial users and export-oriented clean energy markets.
Located within a strategic coastal industrial zone, the Tanjung Agas platform provides strong access to heavy transport networks, marine infrastructure, grid connectivity and regional demand centres. This enables DAZ Solutions to develop a scalable hydrogen production ecosystem that can serve high-value industrial applications while supporting broader decarbonization objectives across the region.
Through disciplined project execution, technology integration and capital-grade infrastructure planning, DAZ Solutions aims to establish Tanjung Agas as a high-yield hydrogen export hub, strengthening the East Coast Economic Region’s role in the emerging clean energy economy and positioning Malaysia as a competitive participant in future regional hydrogen supply chains.
ENGINEERING PARAMETERS
Electrolysis infrastructure scale
Our facility utilizes advanced water electrolysis powered by regional green energy inputs to supply high-purity hydrogen for heavy industry decarbonization pathways.
200 MW
33,517 TPA
Direct Export
Planned electrolyzer capacity utilizing pressurized alkaline technology for continuous utility-scale output.
Targeted annual production of high-purity green hydrogen dedicated to regional heavy industry off-takers.
Strategic deepwater port access in the Pekan corridor ensures streamlined logistics for international markets.


EXECUTION PHASES
Shovel-ready deployment phases
Phase 1: Engineering & Site Prep
Geotechnical surveys and primary water intake engineering are complete at Tanjung Agas. Infrastructure-grade site preparation is underway to support heavy electrolysis machinery foundations.
Phase 2: Power & Integration
Securing dedicated high-voltage green energy inputs from regional grids to power the pressurized water electrolysis systems, ensuring zero-carbon operational integrity.
Engineering schematics and structural specifications are fully aligned with Malaysian industrial safety regulations and international hydrogen manufacturing standards.
INSTITUTIONAL PARTNERSHIP
Secure capital deployment pathways
We bridge the gap between institutional capital allocation and localized engineering execution. Contact our investment advisory team to request full technical specifications.
